Sprogo

Located in the Great Belt strait, north of the Great Belt Bridge, near the island of Sprogo between Zealand and Funen.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime: PSO feed-in premium (open-door regime)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing77 turbines + 0 platforms expected · every expected structure seen
Surveyed2026-09-02from 88 satellite passes
Built2009-08 → 2009-Q4offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-08Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed7 confirmed · 0 not yet confirmedas counted on 2026-09-02 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortNyborg ~15km
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-08
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (7)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Sprogo, 2026-09-08

Sources & verification

16/18 fields verified · rests on 9 sources (4 primary) · ◆ 7 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Energistyrelsen (Danish Energy Agency)2008-12-29◆ Etableringstilladelse - Sprogo Havvindmo…
"Sund & Bælt Holding A/S (herefter Sund & Bælt) fremsendte den 8. september 2008 en ansøgning til Energistyrelsen om etablering af et elproduktionsanlæg nord for Sprogø. [...] Projektet omfatter 7 hav…
supportsConsentTurbinesTotal capacityConsent granted
[3]
Energistyrelsen (Danish Energy Agency)◆ Eksisterende havvindmølleparker
"Energistyrelsen gav den 29. december 2008 Sund & Bælt tilladelse til at etablere syv havvindmøller nord for Sprogø" [...] "Energistyrelsen har den 29. maj 2018 udstedt tilladelse til overdragelse af …
supportsTurbinesTotal capacityMechanismDetailStatus+1 more
Operator2
[4]
European Energy2018-03-15◆ European Energy takes important step in …
“European Energy [...] has agreed to acquire Sprogø Windpark from A/S Storebælt, a subsidiary of Sund & Bælt Holding A/S. The wind park consists of seven 3 MW wind turbines, which feature a total capac…”
supportsTurbinesTotal capacity
[8]
European Energy2018◆ European Energy takes important step in …
supportsoperator
Trade press5
[5]
offshoreWIND.biz2018-03-16◆ European Energy Enters Offshore Wind wit…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionFirst powerCommercial operationTurbinesModel+5 more
[6]
offshoreWIND.biz2019-02-05◆ NorSea Wins Sprogø O&M Deal | Offshore W…
Press report — cited, not quoted; read it at the source link.
supportsBackground
[7]
Boskalis (marine contractor)◆ Offshore wind farm, Sprogø
“offshore wind farm Sprogø [...] gravity bases had weights of up to 1,900 tons [...] 2008 - 2009 [...] SMIT provided the semi-submersible barge Giant 4 [...] for fabrication and transport of the turbin…”
supportsFoundation
[9]
TV2 Fyn2009-08-10
“Mandag begyndte arbejdet med at bygge en vindmøllepark nord for Sprogø. Møllerne skal gøre Sund & Bælt selvforsynende med strøm inden slutningen af 2009. ... I første omgang skal en specialbygget pram…”
supportsOffshore constructionSite rights
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed