Ronland
Nearshore wind farm in Nissum Bredning, the westernmost part of Limfjorden, northeast of Rønland peninsula near Harboøre Tange, North Jutland.
Status
Operationallifecycle stage
Ownership
TNThyborøn-Harboøre Vindmøllelaug I/S — 50% ◆
HRHarboøre Møllelaug I/S / Vindenergi ApS — 50% ◆
Location
North Sea
Technology
Capacity
17.2 MW ◇
Turbines
8 × 2.3 MW ◇
Model
Bonus B82 2300 ◇
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–3 m ◆
Distance from shore
0.1 km ◆
Wind speed
9.7 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ∅
Grid
No agreement ◆
Connection
Subsea cable to land grid (approved by Energistyrelsen … ◆
Schedule
FID
Taken · date not recorded ∴
COD
Jan 2003 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Announced-COD history: 2003-Q1→2003-01 · 2 recorded revisions · held (announced 2003-Q1, unchanged)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeDanish feed-in premium (elforsyningslov PSO, open-door private project)
InstrumentFiT
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing4≈8 turbines + 0 platforms expected · 4 fewer than expected — small or closely spaced early turbines fall below the radar threshold or merge into one return
Surveyed2026-09-01≈from 119 satellite passes
Built2003-01offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07≈Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%≈the whole farm lies inside the image
Structures ringed4 confirmed · 0 not yet confirmed≈as counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortRønland / Thyborøn Harbour area ∅
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (4)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Sources & verification
12/19 fields verified · rests on 4 sources (3 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Energistyrelsen2002-07-19◆ Godkendelse af 8 vindmoeller paa havet v…
“Forslaget på 8 møller, som fremsat af Ringkøbing Amt og later ansøgt af Vindenergi Aps/Harboøre Møllelaug I/S og Thyborøn-Harboøre Vindmøllelaug I/S består af 8 havvindmøller af hver 2 MW placeret på …”
supportsoperatorownerConsentFinal investment decisionSite rights+6 more
[2]
Energistyrelsen2025-11-12◆ Download
“Elproduktionstilladelsen til Rønland havvindmøllepark blev meddelt den 2. januar 2003. Tilladelsen har en varighed på 25 regnet fra den 2. januar 2003 og udløber dermed den 1. januar 2028. [...] Energ…”
supportsFirst powerCommercial operationCOD historyStatusConnection point
Trade press1
[5]
Encyclopaedic1
[4]
Wikipedia2024◆ Rønland Offshore Wind Farm - Wikipedia
“Rønland Offshore Wind Farm is a nearshore wind farm in the westmost part of Limfjorden, Denmark, commissioned in 2003 and consisting of four 2 MW Vestas wind turbines and four 2.3 MW ones from Bonus/S…”
supportsTurbinesModelUnit capacityTotal capacity