Located ~9 km southeast of Rodbyhavn, south of Lolland island. Adjacent to Nysted/Rodsand 1.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2008’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Rødsand 2 re-tender — awarded to E.ON (2008-era legal entity unresolved — the source contradicts itself on Swedish vs German)Rødsand 2 re-tender Apr 2008 · auction recordView the source for Consent grantedConsent granted 6 May 2008 View the source for Onshore constructionOnshore construction 2009-Q2 Final investment decision 2009 View the source for First powerFirst power Jun 2010 View the source for Commercial operationCommercial operation 2010-Q4 Rødsand 2 re-tender — awarded to E.ON (2008-era legal entity unresolved — the source contradicts itself on Swedish vs German) 2008-04 ORIGINATIONE.ON → SEAS-NVE — 80.0% · €147m · closed 2014-Q1 2013-11 DIVESTMENTE.ON → RWE — 20.0% · closed 2020-07 2018-03 Transfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYE.ON (2008-era legal entity unresolved — the source contradicts itself on Swedish vs German) E.ON E.ON not among today’s recorded owners — no sale recordedSEAS-NVE SEAS-NVE SEAS-NVE exited 2013-11RWE — 20% today · operator RWE RWE 20%Andel — 80% today · financial Andel Andel 80%Rødsand 2 re-tender — awarded to E.ON (2008-era legal entity unresolved — the source contradicts itself on Swedish vs German) E.ON → SEAS-NVE — 80.0% · €147m · closed 2014-Q1 80%E.ON → RWE — 20.0% · closed 2020-07 20%Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2010-Q42010-Q4 · 2 recorded revisions · held (announced 2010-Q4, unchanged)

Revenue & offtake contract duration and price levels · money of the day

200 MW contracted — tender award
Tender award · Rødsand 2 re-tender
Price62.9 DKK_ore/kWh ·Capacity200 MWAwardedApr 2008

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing8990 turbines + 1 platform expected · 2 fewer than expected — a position the survey missed
Surveyed2026-09-01from 114 satellite passes
Built2010-Q4offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-08Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed89 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortRodbyhavn ~10km
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-08
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (89)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Rodsand 2, 2026-09-08
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationRodsand B (Rodsand 2 OSS)·33/132 kV · in service 2010 · owner Energinet (Danish TSO — named as end customer of the EPCI contract)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20102011201220132014201520162017201820192020202120222023202420252026developer’s stated start 2010-Q4nowRodsand B (Rodsand 2 OSS)Rodsand B (Rodsand 2 OSS)in service 2010in service 2010

Sources & verification

15/18 fields verified · rests on 10 sources (4 primary) · ◆ 4 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[12]
Energistyrelsen (Danish Energy Agency)
"Afgørelsen er truffet i henhold til VE-lovens § 25, hvorefter Energistyrelsen skal give tilladelse til væsentlige ændringer af eksisterende elproducerende anlæg samt ud fra vilkår fastsat i etablerin…
supportsConsentConsent granted
Operator2
[1]
RWE (Denmark)2024◆ Rødsand 2 Offshore Wind Farm | RWE in De…
“installed capacity of 207 MW … 90 wind turbines with a capacity of 2.3 MW each … tower height of 68.5 metres and a rotor diameter of 93 metres … water depth of 5-13 metres … approximately nine kilomet…”
supportsoperatorTurbinesUnit capacityTotal capacityWater depth+2 more
[9]
RWE2024◆ Rødsand 2 Offshore Wind Farm | RWE in De…
supportsfinancial
Auction results1
[14]
Ingeniøren2008-04-25◆ ing-rodsand-2-retender-2008
"EON bød med 62,9 øre pr. kWh for 50.000 fuldlasttimer en lavere pris end Dong Energy, der var den eneste anden byder. ... Da EON og Dong oprindelig vandt koncessionen med en pris på 49,9 øre pr. kWh,…
supportsTender award · Rødsand 2 re-tender
Trade press6
[2]
Power Technology2010
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionTurbinesModelUnit capacityTotal capacity+3 more
[5]
Ingeniøren2008-04-25◆ EON vinder Rødsand havvindmøllepark | In…
"EON bød med 62,9 øre pr. kWh for 50.000 fuldlasttimer … svarer til 14 års elproduktion" — E.ON bid 62.9 øre/kWh for 50,000 full-load hours (approx. 14 years of production); E.ON's bid was lower than …
supportsMechanismStrike / priceDetail
[6]
Offshore Wind Biz2010-10-13
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD history
[10]
Wikidata2026-07-02
supportsCoordinates
[11]
Energy Supply DK2010-06-02
"I dag leverer ca. 25 vindmøller allerede el, og de øvrige bliver løbende koblet på. ... Samtlige 90 møller skal efter planen være rejst og i gang med at producere el i slutningen af sommeren" — ca. 2…
supportsFirst power
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed