Trianel Windpark Borkum II

Located approximately 45 km north of Borkum Island in the German North Sea EEZ.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).
Announced-COD history: 2020-Q22020-06-30 · 2 recorded revisions · held (announced 2020-Q2, unchanged)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations32 of 32100% · first seen 2018-07-04 · 13 more than the record expects — a met mast, a platform not on the register, or a survey artefact
Turbines42 of 32131% · first seen 2017-12-01
Latest count2021-12-30from 904 satellite passes · 2 substation platforms left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (32 turbines + 2 platforms); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
1020304034 planned (turbines and platforms)latest count 2021-12-30foundations — running total, confirmedDec 2017 — 15 this month · 15 in totalApr 2018 — 0 this month · 15 in totalMay 2018 — 0 this month · 15 in totalJul 2018 — 8 this month · 23 in totalAug 2018 — 3 this month · 26 in totalSep 2018 — 4 this month · 30 in totalOct 2018 — 7 this month · 37 in totalNov 2018 — 8 this month · 45 in totalDec 2018 — 1 this month · 46 in totalApr 2019 — 0 this month · 46 in totalMay 2019 — 1 this month · 47 in totalJul 2019 — 0 this month · 47 in totalAug 2019 — 0 this month · 47 in totalSep 2019 — 0 this month · 47 in totalOct 2019 — 0 this month · 47 in totalNov 2019 — 0 this month · 47 in totalDec 2019 — 0 this month · 47 in totalJan 2020 — 0 this month · 47 in totalFeb 2020 — 0 this month · 47 in totalMar 2020 — 0 this month · 47 in totalApr 2020 — 0 this month · 47 in totalMay 2020 — 0 this month · 47 in totalJun 2020 — 0 this month · 47 in totalJul 2020 — 0 this month · 47 in totalAug 2020 — 0 this month · 47 in totalMay 2021 — 0 this month · 47 in totalturbines up — running total, confirmedDec 2017 — 2 this month · 2 in totalApr 2018 — 1 this month · 3 in totalMay 2018 — 3 this month · 6 in totalJul 2018 — 2 this month · 8 in totalAug 2018 — 0 this month · 8 in totalSep 2018 — 0 this month · 8 in totalOct 2018 — 0 this month · 8 in totalNov 2018 — 0 this month · 8 in totalDec 2018 — 0 this month · 8 in totalApr 2019 — 1 this month · 9 in totalMay 2019 — 0 this month · 9 in totalJul 2019 — 1 this month · 10 in totalAug 2019 — 2 this month · 12 in totalSep 2019 — 3 this month · 15 in totalOct 2019 — 3 this month · 18 in totalNov 2019 — 3 this month · 21 in totalDec 2019 — 1 this month · 22 in totalJan 2020 — 4 this month · 26 in totalFeb 2020 — 2 this month · 28 in totalMar 2020 — 1 this month · 29 in totalApr 2020 — 5 this month · 34 in totalMay 2020 — 5 this month · 39 in totalJun 2020 — 1 this month · 40 in totalJul 2020 — 1 this month · 41 in totalAug 2020 — 1 this month · 42 in totalMay 2021 — 2 this month · 44 in total47 foundations44 turbines upDec 2017Jul 2018Oct 2018Apr 2019Aug 2019Nov 2019Feb 2020May 2020Aug 2020
Satellite image
Image taken2026-09-06Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed74 confirmed · 0 not yet confirmedas counted on 2021-12-30 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortEemshaven ·installation base · quay 5000 m · crane 50 t · draft 14 m
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-06
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (74)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Trianel Windpark Borkum II, 2026-09-06
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationUmspannplattform Trianel Windpark Borkum·33/155 kV · in service 2013 · owner Infrastruktur Windkraftwerk Borkum GmbH & Co. KG (IWB) — farm-side operator, not TSO-owned · also serves Trianel Windpark Borkum I
HVDC systemDolWin1·800 MW · ±320 kV · in service 2015-07 · shared with Borkum Riffgrund 1
Converter supplierHitachi Energy (contracted as ABB; ABB Power Grids sold to Hitachi 2020)·DolWin1 · Heerema Fabrication Group (Netherlands), under EPC from ABB; topside design by Iv · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201320142015201620172018201920202021developer’s stated start 2020-Q2nowDolWin1DolWin1first planned 2013first planned 2013in service 2015-07in service 2015-07Umspannplattform Trianel Windpark BorkumUmspannplattform Trianel Windpark…in service 2013in service 2013

Sources & verification

17/18 fields verified · rests on 10 sources (10 primary) · ◆ 3 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[1]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2016-10◆ Genehmigungsbescheid Offshore-Windpark T…
"Plangenehmigung Offshore-Windenergiepark „Trianel Windpark Borkum, Bauphase 2" … Gegenstand dieser Plangenehmigung sind 34 (vierunddreißig) Windenergieanlagen mit folgenden Parametern: Rotordurchmess…
supportsConsentFoundationStatusConnection pointWater depth+1 more
[2]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2008-06◆ Genehmigungsbescheid Offshore-Windpark T…
"Genehmigung Offshore-Windenergiepark „Borkum West II" … Az.: 5111/Borkum West II/Z 1201 … Auf den Antrag der Prokon Nord Energiesysteme GmbH … werden Errichtung und Betrieb von 80 Windenergieanlagen …
supportsBackground
[12]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Trianel Windpark Borkum, Bauphase 2": 32 units, 202.56 MW gross, statuses {'In Betrieb': 32}, operators ['Trianel Windkraftwerk Borkum II GmbH & Co. KG'], commissioned 2019-09-03..2020-07-01…”
supportsRegister entry
Operator6
[3]
Trianel Windkraftwerk Borkum GmbH & Co. KG2017-04-07
“Mit dem Baubeschluss im Gesellschafterkreis wurde die Grundlage für den zeitnahen Financial Close geschaffen … EWE AG: 37,5 % … Elektrizitätswerk der Stadt Zürich und Fontavis: 24,51 % … 17 Stadtwerke…”
supportsFinal investment decision
[4]
Offshore Wind Biz2017-05-10
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[5]
Trianel GmbH2018-12-03
“Alle 32 Fundamente … im Trianel Windpark Borkum II … fertiggestellt. … erste Monopile Ende Juni 2018 … [Eemshaven as base port]. … 45 Kilometer vor der Küste der Insel Borkum.”
supportsOffshore constructionSite rightsinstallation base
[6]
Trianel GmbH2020-07-06
“Seit dem 30. Juni 2020 drehen sich alle Rotoren der 32 Windkraftanlagen … 200 MW … der letzte Offshore-Windpark mit einer Festvergütung nach dem Erneuerbaren-Energien-Gesetz … EWE AG: 37,5 % … ewz … F…”
supportsFirst powerCommercial operationCOD historyTurbinesTotal capacity+2 more
[7]
Offshore Wind Biz2016-09-28
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityDistance from shoreCoordinates
[10]
Trianel2026
“EWE AG, ewz Offshore Borkum GmbH ... and the municipal utility cooperation Trianel together with 17 municipal utilities from Germany are involved in the wind farm.”
supportsinvestoroperator
Trade press1
[11]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed