N-12.1

Part of 7 GW auction. TotalEnergies bid EUR 1.87 million/MW. Extremely distant from shore - longest connection in German waters.

Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
TotalEnergies — 100% 
Location
Germany
North Sea
Technology
Capacity 2,000 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination BNetzA Offshore Wind Auction 2023 (dynamic bidding / concession) · 2023 ·
Water depth 36–42 m  Wind speed 10.4 m/s @ 150 m 
Revenue & grid
Offtake Merchant  Grid Offered · 2023-07-12  Connection TenneT North Sea; NOR-12-1 cable route conditionally designated … 
Schedule
FID Not taken
COD · Hafrok 2033 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2033
expected year of commercial operation
Chance of delivery
≈59% estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits below that: a very large build and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2032: 14.1% (conditional on completion) 2033: 28.0% (conditional on completion) 2034: 22.7% (conditional on completion) 2035: 14.6% (conditional on completion) 2036: 8.7% (conditional on completion) 2037: 5.1% (conditional on completion) 2038: 3.1% (conditional on completion) 2039: 1.8% (conditional on completion) 2040: 1.1% (conditional on completion) 2041: 0.7% (conditional on completion)2026now202820302032203328%EXPECTED2034203620382040
COD probability by year, conditional on completion
YearProbability
203214.1%
2033 (expected)28.0%
203422.7%
203514.6%
20368.7%
20375.1%
20383.1%
20391.8%
20401.1%
20410.7%
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (2026), adds the time similar projects (in established offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.
2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before 2033 is not credible.
3
Result
Expected commercial operation 2033, likely range 2033–2039 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈59%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2024’25’26’27’28’29’30’31’32’33BNetzA Offshore Wind Auction 2023 (dynamic bidding / concession) — awarded to North Sea OFW N12-1 GmbH & Co. KGBNetzA Offshore Wind Auction 2023 (dynamic bidding / concession) Jul 2023 · auction recordCommercial operation 2033 ·Hafrok expectedBNetzA Offshore Wind Auction 2023 (dynamic bidding / concession) — awarded to North Sea OFW N12-1 GmbH & Co. KG 2023-07 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYNorth Sea OFW N12-1 GmbH & Co. KG North Sea OFW N12-1 Gmb… North Sea OFW N12-1 Gmb… not among today’s recorded owners — no sale recordedTotalEnergies — 100% today TotalEnergies TotalEnergies 100%BNetzA Offshore Wind Auction 2023 (dynamic bidding / concession) — awarded to North Sea OFW N12-1 GmbH & Co. KG Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake route to market — open

No offtake secured — route to market open

Zero-subsidy dynamic bidding (BNetzA July 2023); TotalEnergies (via North Sea OFW N12-1 GmbH & Co. KG) paid €1.875 mn/MW (€3.75 bn total) to win site N-12.1 — no EEG market premium, merchant operation. Electricity to be sold directly on market or via PPAs (TotalEnergies July 2023). Project renamed Nordsee Energies 1 (NSE1) October 2024.

The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Next visible round · from the auction calendar
Germany offshore tender — 2027 (FEP cluster)
expected 2027 · planned · the round’s published documents do not name this project
indicative

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

5/11 fields verified · rests on 10 sources (3 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[2]
Bundesnetzagentur2023-07-12◆ Bundesnetzagentur - Presse - Ergebnisse …
“für die Fläche N-12.1 die Bieterin North Sea OFW N12-1 GmbH & Co. KG zu einem Gebotswert von 1,875 Mio. Euro/MW … einer Zahlung von 3,75 Mrd. Euro für die Fläche N-12.1”
supportsConsentTotal capacityMechanismDetailStatus+2 more
[7]
Bundesnetzagentur2023
supportsTotal capacity
Operator2
[3]
TotalEnergies2023-07-12◆ TotalEnergies Wins Two Maritime Leases t…
"Located in the North Sea, 170 kilometers off the coast, concession N-12.1 covers an area of around 200 square kilometers" with a capacity of 2,000 MW. "These wind farms will be marketed by TotalEnerg…
supportsTotal capacity
[4]
Baltic Wind (reporting TotalEnergies announcement)2024-10-14◆ TotalEnergies renames key German offshor…
Press report — cited, not quoted; read it at the source link.
supportsFirst power
Auction pipeline1
[11]
Bundesnetzagentur2026◆ bnetza-noncentral-2027
BNetzA — 2026 non-central offshore tenders suspended; N-10.1/N-10.2/N-12.4/N-12.5/N-13.1/N-13.2 moved to tender year 2027.
supportsGermany offshore tender — 2027 (FEP cluster)
Trade press4
[6]
offshoreWIND.biz2023-07
Press report — cited, not quoted; read it at the source link.
supportsowner
[8]
4C Offshore2026-07-02
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[9]
GEBCO Compilation Group2020
supportsWater depth
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown◆ Germany: TotalEnergies Wins Further Mari…
supportsTotal capacityWater depthCoordinates