SPIC Zhanjiang Xuwen Phase 1

Located in Jinhe, Xuwen, Zhanjiang, Guangdong. Phase 2 (300 MW) added December 2024.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime: FIT (CNY 0.85/kWh) — commissioned before 31 Dec 2021
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2021

Sources & verification

1/14 fields verified · rests on 10 sources (1 primary) · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[6]
Guangdong Provincial Department of Ecology and Environment (广东省生态环境厅)2020-07-13
“项目总装机容量600MW,共布置94台6.45MW风力发电机组 ... 我厅同意批准《报告书》。”
supportsConsentConsent granted
Trade press8
[2]
offshoreWIND.biz2024-12
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacity
[3]
Global Energy Monitor2026-07-02◆ Guangdong Zhanjiang Xuwen Offshore wind …
“Guangdong Zhanjiang Xuwen Offshore wind farm is an operating wind farm in Jinhe, Xuwen, Zhanjiang, Guangdong, China. ... 1 ... Operating ... 2022”
supportsoperatorCommercial operationStatusConnection pointCoordinates
[4]
GEBCO Compilation Group2020
supportsWater depth
[5]
Carbon Trust2014
supportsMechanismDetail
[7]
Power Technology (GlobalData)2024-10
Press report — cited, not quoted; read it at the source link.
supportsConstruction startSite rights
[8]
offshoreWIND.biz2021-04-02
Press report — cited, not quoted; read it at the source link.
supportsConstruction startSite rights
[9]
Enerdata2021-12-02
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionFirst power
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTurbinesModelUnit capacityTotal capacityWater depth+1 more