SPIC Jieyang Shenquan Phase II

Located in Shenquan, Huilai, Jieyang, Guangdong.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)

Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. ·

A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2022

Sources & verification

1/12 fields verified · rests on 9 sources · ◆ 2 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press8
[2]
offshoreWIND.biz2022-12
Press report — cited, not quoted; read it at the source link.
supportsTurbinesTotal capacity
[3]
Global Energy Monitor2026-07-02◆ Guangdong Jieyang Shenquan 2 Offshore wi…
“Guangdong Jieyang Shenquan 2 Offshore wind farm is an operating wind farm in Shenquan, Huilai, Jieyang, Guangdong, China. ... Operating ... 2022”
supportsoperatorFinal investment decisionCommercial operationFoundationStatus+2 more
[4]
GEBCO Compilation Group2020
supportsWater depth
[5]
每日风电 (chinawindnews.com)2018-11-27
“11月22日,国家电投广东公司揭阳神泉二35万千瓦海上风电项目获得揭阳市发改局核准”
supportsConsentConsent granted
[6]
21世纪经济报道 (21jingji.com)2022-09-28
“该项目于今年5月28日开工”
supportsConstruction startSite rights
[7]
The Paper (澎湃新闻)2022-12-02
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[8]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[9]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTurbinesTotal capacityWater depthCoordinates