Shandong Muping (Three Gorges)
Shandong Muping (Three Gorges). GEM records phase 1 300 MW construction.
Status
Operationallifecycle stage
Ownership
Location
Yellow Sea
Technology
Capacity
300 MW ◇
Turbines
34 ◇
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
29 Dec 2023 ◇
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)
Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. · ◇
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2023-12-29
Sources & verification
1/8 fields verified · rests on 5 sources (2 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[5]
Ministry of Ecology and Environment of the PRC2026-01-23◆ MEE public notice: marine engineering EI…
“三峡山东牟平 BDB6#续建(二期)海上风电项目
黄海
三峡新能源(烟台牟平区)
有限公司”
supportsBackground
Operator1
[4]
China Three Gorges e-procurement platform (CTG Renewables Shandong)2024-12-20◆ Muping BDB6# Phase I offshore wind: 30MW…
“GIS需与牟平一期陆上集控中心已建成双母线联通,其他电气设备均为新建,应考虑与牟平一期陆上集控中心工程接口”
supportsCommercial operation
Trade press3
[1]
Global Energy Monitor2026◆ Shandong Muping (Three Gorges) Offshore …
supportsoperatorConsentFinal investment decisionConstruction startSite rights+3 more
[2]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] Offshore floating: are an emerging technology designed for installation in de…”
supportsFoundation
[3]
iQilu (Shandong Radio and Television), reprinting Dazhong News2026-01-27◆ Three Gorges Yantai Muping offshore wind…
Press report — cited, not quoted; read it at the source link.
supportsConstruction startFirst powerCommercial operationSite rightsTurbines+1 more