Shandong Bandaonan U1 Phase 1
Phase 1 of SPIC's 900 MW Bandaonan U1 site, in the sea south of Rushan, Weihai, Shandong.
Status
Operationallifecycle stage
Ownership
SIState Power Investment (Rushan) Offshore Wind Power ◇
Location
Yellow Sea
Technology
Capacity
450 MW ◇
Turbines
53 ◆
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
25–31 m ◆
Distance from shore
24 km ◆
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
17 Nov 2023 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)
Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. · ◇
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2023-11-17
Sources & verification
7/13 fields verified · rests on 7 sources · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[3]
山东省能源局 (Shandong Provincial Energy Bureau)2023-11-22◆ 国家电投山东能源半岛南U1场址一期全容量并网发电
“近日,在威海乳山南侧海域,随着最后一台风机完成并网调试,国家电投山东能源半岛南U1场址 90万千瓦海上风电项目一期全容量并网发电。据悉,一期工程装机规模45万千瓦…配套1座海上升压站 及陆上集控中心,布局53台单机容量8.5兆瓦风电机组…配置明阳智能MySE8.5-230型号半直驱风机… 项目于2022年12月31日取得核准;2023年11月17日,实现全容量并网。 [EN] Recently, …”
supportsConsentCommercial operationTurbinesConsent granted
[4]
山东省能源局 (Shandong Provincial Energy Bureau)2023-03-02◆ 国家电投半岛南U场址海上风电项目 (900MW, 两期)
“国家电投半岛南U场址海上风电项目,位于威海乳山南侧海域,场址中心距离海岸24公里,平均水深 25—31米…总投资100亿元,总装机容量900兆瓦,分两期建设,一期投资53亿元,布局53台单机容量 8.5兆瓦风电机组,配套1座220千伏海上升压站及陆上集控中心…二期拟建设53台单机容量8.5兆瓦 风电机组。 [EN] SPIC's Bandaonan U site offshore wind pro…”
supportsWater depthDistance from shore
Trade press5
[1]
Global Energy Monitor2026◆ Shandong Bandaonan U Offshore wind farm
supportsoperatorFinal investment decisionCommercial operationSite rightsTotal capacity+2 more
[2]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] Offshore floating: are an emerging technology designed for installation in de…”
supportsFoundation
[5]
[6]
[7]