Mingyang Yangjiang Qingzhou IV

Located in Shaba, Yangxi, Yangjiang, Guangdong. Annual generation ~1.8 TWh.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

5 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 8 sources (1 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[4]
Guangdong Provincial Department of Ecology and Environment (广东省生态环境厅)2022-06-29
“广东省生态环境厅关于明阳阳江青洲四海上风电场项目环境影响报告书的批复 ... 粤环审[2022]147号 2022-06-29 阳江明阳蕴华海上风电开发有限公司 广东阳江阳西县”
supportsConsentConsent granted
Trade press6
[2]
GEM2026◆ Guangdong Yangjiang Qingzhou IV Offshore…
“Guangdong Yangjiang Qingzhou IV Offshore wind farm is an operating wind farm in Shaba, Yangxi, Yangjiang, Guangdong, China. ... Operating ... 2024”
supportsoperatorCommercial operationTotal capacityStatusConnection point+1 more
[3]
GEBCO Compilation Group2020
supportsWater depth
[5]
CPEM (全国电力设备管理网)2022-09-06
“8月31日上午,明阳阳江青洲四海上风电场项目陆海全面施工启动仪式在阳西县顺利举行。”
supportsOnshore constructionOffshore constructionSite rights
[6]
Sina Finance (新浪财经)2024-02-01
“1月31日,记者从明阳智能了解到,该公司阳江青洲四海上风电场项目已正式全容量并网”
supportsFinal investment decisionFirst power
[7]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[8]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
Unverified import1
[1]
unknown◆ Guangdong Yangjiang Qingzhou IV Offshore…
supportsTotal capacityFoundationWater depthCoordinates
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.