Mingyang Yangjiang Qingzhou IV

Located in Shaba, Yangxi, Yangjiang, Guangdong. Annual generation ~1.8 TWh.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)

Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. ·

A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2024
Offshore construction2022-08-31 → 2024

Sources & verification

1/11 fields verified · rests on 8 sources (1 primary) · ◆ 3 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[4]
Guangdong Provincial Department of Ecology and Environment (广东省生态环境厅)2022-06-29
“广东省生态环境厅关于明阳阳江青洲四海上风电场项目环境影响报告书的批复 ... 粤环审[2022]147号 2022-06-29 阳江明阳蕴华海上风电开发有限公司 广东阳江阳西县”
supportsConsentConsent granted
Trade press6
[2]
GEM2026◆ Guangdong Yangjiang Qingzhou IV Offshore…
“Guangdong Yangjiang Qingzhou IV Offshore wind farm is an operating wind farm in Shaba, Yangxi, Yangjiang, Guangdong, China. ... Operating ... 2024”
supportsoperatorCommercial operationTotal capacityStatusConnection point+1 more
[3]
GEBCO Compilation Group2020
supportsWater depth
[5]
CPEM (全国电力设备管理网)2022-09-06
“8月31日上午,明阳阳江青洲四海上风电场项目陆海全面施工启动仪式在阳西县顺利举行。”
supportsOnshore constructionOffshore constructionSite rights
[6]
Sina Finance (新浪财经)2024-02-01
“1月31日,记者从明阳智能了解到,该公司阳江青洲四海上风电场项目已正式全容量并网”
supportsFinal investment decisionFirst power
[7]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[8]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
Unverified import1
[1]
unknown◆ Guangdong Yangjiang Qingzhou IV Offshore…
supportsTotal capacityFoundationWater depthCoordinates