Huadian Yangjiang Qingzhou III

Located in Shaba, Yangxi, Yangjiang, Guangdong.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)

Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. ·

A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2022
Offshore construction2020-12-29 → 2022

Sources & verification

1/11 fields verified · rests on 8 sources (2 primary) · ◆ 3 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[4]
Guangdong Provincial Department of Ecology and Environment (广东省生态环境厅)2020-07-13
“经审查,《报告书》基本符合环境保护有关法律法规的要求,在《报告书》提出的各项污染防治对策、生态保护措施和应急措施得到落实的前提下,工程建设对环境产生的不利影响可得到减缓,从海洋环境保护的角度考虑,工程建设可行。我厅同意批准该《报告书》。(粤环审〔2020〕141号,2020年7月13日)”
supportsConsentConsent granted
[6]
NEA Electric Power Reliability Management and Engineering Quality Supervision Center (国家能源局电力可靠性管理和工程质量监督中心)2023-03
“2023年3月24日至25日,可再生能源质监站主要负责同志带队,对华电阳江青洲三海上风电场项目进行质量监督回访。该项目装机容量为500MW,于2021年12月31日全容量并网投产,是已建成的大型海上风电项目中离岸最远、水深最深、施工难度最大、建设工期最短的项目。”
supportsFinal investment decisionCommercial operation
Trade press5
[2]
GEM2026◆ Guangdong Yangjiang Qingzhou III Offshor…
“Guangdong Yangjiang Qingzhou III Offshore wind farm is an operating wind farm in Shaba, Yangxi, Yangjiang, Guangdong, China.”
supportsoperatorCommercial operationTotal capacityStatusConnection point+1 more
[3]
GEBCO Compilation Group2020
supportsWater depth
[5]
Yangjiang Radio and Television (阳江视听网)2021-01-04
“2020年12月29日,广东华电阳江青洲三50万千瓦海上风电项目打响沉桩第一锤,标志着我国首个离岸最远、水深最深、单机容量及总装机规模最大的海上风电项目正式进入施工阶段。”
supportsOffshore constructionSite rights
[7]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[8]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
Unverified import1
[1]
unknown◆ Guangdong Yangjiang Qingzhou III Offshor…
supportsTotal capacityFoundationWater depthCoordinates