Hainan Danzhou CZ3 (Datang)

Hainan Danzhou CZ3 (Datang). GEM records phase 1 600 MW (2025) operating. GEM also lists phase 2 600 MW pre-construction, not covered by this record.

Status
Operationallifecycle stage
Ownership
DHDatang Hainan Energy Development 
Location
China
South China Sea
Technology
Capacity 600 MW 
Turbines
Foundation Fixed-bottom (structure not recorded) 
Site & conditions
Site rights Seabed rights held 
Revenue & grid
Offtake
Grid
Schedule
FID Taken · date not recorded  COD 2025 

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)

Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. ·

A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2025

Sources & verification

0/7 fields verified · rests on 2 sources · ◆ 2 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press2
[1]
Global Energy Monitor2026◆ Hainan Danzhou CZ3 (Datang) Offshore win…
supportsoperatorConsentFinal investment decisionCommercial operationSite rights+3 more
[2]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] Offshore floating: are an emerging technology designed for installation in de…”
supportsFoundation