Hainan CZ7 (CNOOC)
Located west of Dongfang City, Hainan. CNOOC leveraging offshore oil infrastructure expertise for wind development.
Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
CNCNOOC — 100% ◇
Location
South China Sea
Technology
Capacity
1,500 MW ◇
Turbines
—
Foundation
—
Site & conditions
Site rights
Seabed rights held 2023-04 ◇
Water depth
18–31 m ≈
Wind speed
8.9 m/s @ 150 m ≈
Revenue & grid
Offtake
Other ◇
Grid
—
Schedule
FID
Not taken
COD · announced
2029 ◇
COD · Hafrok
2029 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2029
expected year of commercial operation
Chance of delivery
≈71%
estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. This one sits below that: a very large build and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
| Year | Probability |
|---|---|
| 2028 | 3.9% |
| 2029 (expected) | 50.2% |
| 2030 | 29.5% |
| 2031 | 10.6% |
| 2032 | 3.8% |
| 2033 | 1.4% |
| 2034 | 0.6% |
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in
2023. From there Hafrok adds how long similar projects (in established offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of
2027; the faster quarter of similar projects would be done by 2025, the slower quarter not until 2028.3
Result
Expected commercial operation
2029, likely range 2025–2028 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈71%, which rates it
Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD.
Revenue & offtake route to market — open
No offtake secured — route to market open
Grid parity (no national subsidy, post-2022 China regime) ◇
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Next visible round · from the auction calendar
Guangxi Beihai Deep-Sea Offshore Wind Competitive Allocation (广西深远海竞配) ◇
~6,500 MW deep-sea allocation launched ~2024-07 (Beihai south sea-area: N sites 5,700 MW + P site 800 MW, ~94-120 km offshore). No settled result yet.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2029
Sources & verification
0/10 fields verified · rests on 8 sources · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Auction pipeline1
[9]
gdshe.org (relaying 北极星风力发电网)2024-07◆ cn-gx2024-launch
广西北海海上风电竞争性配置…N场址…规划容量570万千瓦,P场址规划容量80万千瓦 (~6,500 MW deep-sea), ~94-120 km offshore, 15-45 m depth.
supportsGuangxi Beihai Deep-Sea Offshore Wind Competitive Allocation (广西深远海竞配)
Trade press6
[2]
Enerdata2023-04-17
Press report — cited, not quoted; read it at the source link.
supportsoperatorConsentCommercial operationSite rightsTotal capacity+4 more
[3]
Sina Finance2025-07-23
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[5]
offshoreWIND.biz2025-10
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[6]
[7]
[8]
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depthCoordinates