Jieyang Shenquan I Phase 2
The second of two separately-approved phases of the Jieyang Shenquan I offshore wind farm, in the 慈航 (Cihang) site south of Qianzhan town, Huilai county, Jieyang, Guangdong.
Status
Operationallifecycle stage
Ownership
Location
South China Sea
Technology
Capacity
91 MW ◆
Turbines
—
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Revenue & grid
Offtake
—
Grid
—
Schedule
COD
2023 ◇
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)
Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. · ◇
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2023
Sources & verification
4/6 fields verified · rests on 2 sources · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[1]
广东省 / 揭阳市人民政府门户网站◆ 广东省纳入新能源可持续发展价格结算机制存量项目清单
“59 揭阳市 惠来县 国家电投揭阳神泉一(二期)海上风电场项目 海上风电 揭阳市发展和改革局关于国家电投揭阳神泉一(二期)海上风电场项目变更的复函 (揭发改核准〔2022〕5号) 9.1 [EN] Row 59, Jieyang City, Huilai county: "SPIC Jieyang Shenquan I (Phase 2) Offshore Wind Farm Project", …”
supportsoperatorConsentTotal capacity
Trade press1
[2]
Global Energy Monitor2026◆ Guangdong Jieyang Shenquan 1 Offshore wi…
“GEM records phase 1 316 MW (2021) operating; phase 2 91 MW (2023) operating.”