Fujian Changle Waihai Area C
Located 31-48 km east of Changle coast, Fujian. 72 three-leg suction pile jacket foundations. Annual generation ~1 TWh.
Status
Operationallifecycle stage
Ownership
FFFujian Funeng — 50% ◇
CTChina Three Gorges — 50% ◇
Location
Taiwan Strait
Technology
Capacity
496 MW ◇
Turbines
72 ◇
Model
Various Cssc 6-7-8-0-10-0 MW ◇
Foundation
Jacket ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
35–43 m ≈
Wind speed
10.4 m/s @ 100 m ≈
Revenue & grid
Offtake
—
Grid
Not recorded ◇
Connection
Fuzhou 220 kV onshore substation ◇
Schedule
FID
Taken · date not recorded ∴
COD
Oct 2023 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)
Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. · ◇
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2023-10
Sources & verification
1/13 fields verified · rests on 11 sources (2 primary)
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[10]
Fuzhou Changle Ecological Environment Bureau (福州市长乐生态环境局)2023-10-19
“长乐外海海上风电场C区项目...海洋工程环保竣工验收决定的公示...2023年10月19日-2023年10月26日(5个工作日)”
supportsCommercial operation
Operator2
[6]
Fujian Yongfu Power Engineering Co., Ltd. (永福股份)2019-01-10
“2018年12月29日与31日,永福股份与福建省水利水电勘测设计研究院联合设计的福建长乐外海海上风电场A区、C区项目分别获得福建省发展和改革委员会核准”
supportsConsentConsent granted
[8]
China Power News Network (中国电力新闻网)2021-10-25
Press report — cited, not quoted; read it at the source link.
supportsFirst power
Trade press7
[2]
[3]
[4]
[5]
[7]
Changle News Network (长乐新闻网)2020-01-08
“近日,福能海峡长乐外海海上风电场A区、C区项目陆上集控站破土动工。”
supportsOnshore constructionSite rights
[9]
龙船风电网 (imarine.cn)2023-10-25
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionCommercial operation
[11]
Unverified import1
[1]