CHN Energy Bozhong B2 (Guohua)
Located near Dongying Port, Shandong, adjacent to Bozhong A.
Status
Operationallifecycle stage
Ownership
GIGuohua Energy Investment — 100% ◇
Location
Bohai Sea
Technology
Capacity
502 MW ◆
Turbines
59 × 8.5 MW ◆
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
17–19 m ◆
Distance from shore
19 km ◆
Wind speed
7.8 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◆
Grid
Not recorded ◆
Connection
220 kV offshore booster station to Dongying grid ◆
Schedule
COD
2023 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
1 dated milestone on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 6 sources · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[2]
CHN Energy2023-07
“Since the first batch of turbines were put into operation and connected to the grid, the project has generated about 157 million kWh of clean electricity. ... At 8:40 a.m. on June 25, the last turbine…”
supportsCommercial operationTurbinesUnit capacityTotal capacityMechanism+5 more
[3]
Global Energy Monitor2026-07-02◆ Shandong Bozhong B2 Offshore wind farm -…
supportsoperatorFoundationCoordinates
[4]
CHN Energy2023-07
“2022年下半年,在渤中I场址项目出现极端困难,无法完成年度项目建设任务时,国华投资坚定建设目标不动摇,勇于担当、科学决策,及时启动B2场址备选项目。 ... 项目核准仅用73天,创山东省海上风电核准最快纪录 ... 集团内首个当年核准、当年开工、当年投产的海上风电项目 ... 全部59根风机基础钢管桩从首桩下料到全部沉桩用时105天”
supportsConsentSite rights
[5]
[6]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
Unverified import1
[1]