Bohai B1
Bohai B1 is an offshore wind farm in the Bohai Sea, China, owned by Shandong Energy Group, under construction.
Status
Under Constructionlifecycle stage
Near certainHafrok delivery likelihood
Ownership
SHShandong Energy Group — 100% ◇
Location
Bohai Sea
Technology
Capacity
500 MW ◇
Turbines
—
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
10–16 m ≈
Wind speed
8.1 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD · Hafrok
for registered readers
Delivery outlook modelled by Hafrok · calibrated on delivered projects
Near certainHafrok's delivery likelihood for Bohai B1
The developer has stated no date. Hafrok's year, the chance and the working are for registered readers.
Free for registered readers in early access · register below ↓
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
the dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 6 sources · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[6]
千里马招标网 (tender aggregator republishing Shandong Energy's procurement notice)2025-08-04◆ 山东能源渤中海上风电B1场址项目海洋环境影响评价专题技术服务公开询价公告
Copyrighted source — cited, not quoted; read it at the source link.
supportsSite rightsTotal capacity
Trade press5
[1]
Global Energy Monitor2026◆ Shandong Bohai B1 offshore wind farm - G…
supportsownerConsentFinal investment decisionSite rightsTotal capacity+2 more
[2]
[3]
[4]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
[5]
千里马招标网 (republishing China Electric Power Equipment Group Central-South Survey & Design Institute's procurement notice)2024-10-22◆ 山东能源渤中海上风电基地B1项目风机基础制作及施工、风机塔筒吊装公开竞争性谈判公…
Copyrighted source — cited, not quoted; read it at the source link.
supportsSite rights