CHN Energy Bozhong B2 (Guohua)
Located near Dongying Port, Shandong, adjacent to Bozhong A.
Status
Operationallifecycle stage
Ownership
GIGuohua Energy Investment — 100% ◇
Location
Bohai Sea
Technology
Capacity
502 MW ◆
Turbines
59 × 8.5 MW ◆
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
17–19 m ◆
Distance from shore
19 km ◆
Wind speed
7.8 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◆
Grid
Not recorded ◆
Connection
220 kV offshore booster station to Dongying grid ◆
Schedule
COD
2023 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime: Grid parity — CHN Energy's first affordable offshore project
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2023
Sources & verification
9/15 fields verified · rests on 6 sources · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[2]
CHN Energy2023-07
“Since the first batch of turbines were put into operation and connected to the grid, the project has generated about 157 million kWh of clean electricity. ... At 8:40 a.m. on June 25, the last turbine…”
supportsCommercial operationTurbinesUnit capacityTotal capacityMechanism+5 more
[3]
Global Energy Monitor2026-07-02◆ Shandong Bozhong B2 Offshore wind farm -…
supportsoperatorFoundationCoordinates
[4]
CHN Energy2023-07
“2022年下半年,在渤中I场址项目出现极端困难,无法完成年度项目建设任务时,国华投资坚定建设目标不动摇,勇于担当、科学决策,及时启动B2场址备选项目。 ... 项目核准仅用73天,创山东省海上风电核准最快纪录 ... 集团内首个当年核准、当年开工、当年投产的海上风电项目 ... 全部59根风机基础钢管桩从首桩下料到全部沉桩用时105天”
supportsConsentSite rights
[5]
[6]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
Unverified import1
[1]