CGN Shanwei Houhu

Located in Hudong, Lufeng City, Shanwei, Guangdong. Annual generation ~1.5 TWh.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime: FIT (CNY 0.85/kWh) — commissioned before 31 Dec 2021
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2021
Offshore construction2019-12-27 → 2021

Sources & verification

1/12 fields verified · rests on 9 sources (1 primary) · ◆ 3 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[5]
Guangdong Baolihua New Energy Co., Ltd. (SZSE:000690), via cninfo.com.cn2018-09-18
“近日,公司收到汕尾市发展和改革局《关于汕尾后湖(500MW)海上风电场项目核准的批复》(汕发改[2018]198 号),公司汕尾后湖(500MW)海上风电场项目获核准批复。根据批复文件,本项目建设规模为 500 兆瓦,建设地点为陆丰市湖东镇后湖南侧海域。”
supportsConsentConsent granted
Trade press7
[2]
GEM2026◆ Guangdong Shanwei Houhu Offshore wind fa…
“Guangdong Shanwei Houhu Offshore wind farm is an operating wind farm in Hudong, Lufeng City, Shanwei, Guangdong, China.”
supportsoperatorCommercial operationTotal capacityStatusConnection point+1 more
[3]
GEBCO Compilation Group2020
supportsWater depth
[4]
Carbon Trust2014
supportsMechanismDetail
[6]
Southern Daily (南方日报), via The Paper (澎湃新闻)2022-12-20
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionOffshore constructionSite rights
[7]
Sina Finance (新浪财经)2021-11-25
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionFirst power
[8]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[9]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
Unverified import1
[1]
unknown◆ Guangdong Shanwei Houhu Offshore wind fa…
supportsTotal capacityFoundationWater depthCoordinates