CGN Huizhou Gangkou Phase II

Located in Pinghai/Huidong, Huizhou City, Guangdong. Annual generation ~3 TWh. CGN Huizhou total (Phase I+II) = 1,000 MW.

Status
Operationallifecycle stage
Ownership
CGChina General Nuclear Power — 100% 
Location
China
South China Sea
Technology
Capacity 750 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held  Water depth 30–37 m  Wind speed 7.7 m/s @ 100 m 
Revenue & grid
Offtake
Grid Not recorded  Connection Huizhou 220 kV Gangkou substation 
Schedule
COD 2023 

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime of the vintage — not a recorded contract
Post-subsidy era — provincial pricing (NDRC notice 2021)

Built after the national subsidy ended. From 2021, newly approved offshore wind projects are priced by the provincial price authority — through competitive allocation where conditions allow — with no central subsidy; the grid company settles the part within the local coal benchmark price. A project approved before 2021 that connected after the 2021 deadline takes the guide price of its connection year. Provincial top-ups (Guangdong, Shandong, Zhejiang and others) exist and are recorded on projects only where a source states them. ·

A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2023

Sources & verification

0/10 fields verified · rests on 5 sources
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press4
[2]
cnbayarea.org.cn2024
“Phase II, a 750,000-kilowatt project, started on March 15, 2023, and put into operation on December 12, 2023.”
supportsOnshore constructionCommercial operationSite rightsTotal capacityStatus+1 more
[3]
Global Energy Monitor2026-07-02
supportsoperatorCoordinates
[4]
GEBCO Compilation Group2020
supportsWater depth
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTotal capacityWater depthCoordinates