Rentel

Belgian EEZ, ~34 km from Zeebrugge. O&M at Port of Ostend.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2009’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the sources for Consent grantedConsent granted 4 Jun 2009 Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Rentel NVBelgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) Jun 2009 · auction recordView the source for Final investment decisionFinal investment decision Oct 2016 View the source for Offshore constructionOffshore construction Apr 2017 View the source for First powerFirst power 2018 View the sources for Commercial operationCommercial operation 2018-Q4 Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Rentel NV 2009-06 ORIGINATIONAspiravi Offshore, DEME Concessions Wind, Elicio, Green Offshore, Power@Sea, Socofe, SRIW Environnement, Z-Kracht — stake not disclosed · closed 2016-10 2016-Q3 JV FORMATIONTODAYRentel NV — 100% today · operator Rentel NV Rentel NV 100%Aspiravi Offshore Aspiravi Offshore Aspiravi Offshore exited 2016-Q3DEME Concessions Wind DEME Concessions Wind DEME Concessions Wind exited 2016-Q3Elicio Elicio Elicio exited 2016-Q3Green Offshore Green Offshore Green Offshore exited 2016-Q3Power@Sea Power@Sea Power@Sea exited 2016-Q3Socofe Socofe Socofe exited 2016-Q3SRIW Environnement SRIW Environnement SRIW Environnement exited 2016-Q3Z-Kracht Z-Kracht Z-Kracht exited 2016-Q3Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Rentel NV Aspiravi Offshore, DEME Concessions Wind, Elicio, Green Offshore, Power@Sea, Socofe, SRIW Environnement, Z-Kracht — stake not disclosed · closed 2016-10
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2018-Q42018-Q4 · 2 recorded revisions · held (announced 2018-Q4, unchanged)

Revenue & offtake contract duration and price levels · money of the day

309 MW contracted — concession
Concession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Price€129.8/MWh ·Capacity309 MWAwardedJun 2009
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing4242 turbines + 1 platform expected · 1 fewer than expected — a position the survey missed
Surveyed2026-09-01from 120 satellite passes
Built2017-04 → 2018-Q4offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed42 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Ostend installation and om
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (42)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Rentel, 2026-09-07
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationMOG / Modular Offshore Grid·220 kV · in service 2019 · owner Elia (Belgian TSO) · also serves Northwester 2, SeaMade (Seastar 252 MW + Mermaid 235 MW)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201820192020202120222023202420252026developer’s stated start 2018-Q4nowMOG / Modular Offshore GridMOG / Modular Offshore Gridin service 2019in service 2019

Sources & verification

16/17 fields verified · rests on 13 sources (10 primary) · ◆ 4 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator10
[1]
Otary2025
“Rentel is located between the Thornton and Lodewijck banks (offshore Belgium). Turbine model: SWT 7.0-154. Fully operational since late 2018. November 2018. Concession granted: 2009. Permits acquired:…”
supportsConsentCommercial operationCOD historyTurbinesModel+5 more
[2]
Otary2016-10◆ Rentel reaches Financial Close - News - …
“Rentel nv has reached Financial Close for its 309 MW offshore wind farm in the Belgian North Sea. The project is financed by its 8 shareholders and a consortium consisting of the European Investment B…”
supports↳ parents
[3]
Offshore Wind Biz2016-10-03
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[4]
Offshore Wind Biz2017-04-06◆ Belgium Starts Building Rentel Offshore …
Press report — cited, not quoted; read it at the source link.
supportsOffshore construction
[5]
Belgian Offshore Platform2025
“Rentel: 309 MW, 42 turbines, monopile foundations, water depth 22 to 36 meters, distance from shore 34 km, surface area 22.72 km2. The Rentel turbines are operational and produce green energy since 20…”
supportsCommercial operationWater depthDistance from shore
[8]
Offshore Wind Biz2019-09-11
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[9]
Offshore Wind Biz2016-04-22
Press report — cited, not quoted; read it at the source link.
supportsinstallation and om
[10]
Offshore Energy2016
Press report — cited, not quoted; read it at the source link.
supportsModelFoundationWater depth
[11]
Offshore Energy2020-06
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[12]
Jan De Nul
“Building works started early 2018. Later that year, production started to supply green power to approximately 300,000 Belgian households every year.”
supportsFirst power
Auction results1
[14]
RBINS / MUMM (Brabant, Degraer & Rumes, 2011 — Offshore wind farms in the Belgian part of the North Sea, ch. 2)2011◆ rbins-mumm-2011-belgian-owf-ch2
Table 1, "Overview of the dates when the projects were granted a domain concession and an environmental permit": C-Power 27/06/03 · Belwind 5/6/2007 · Eldepasco 15/5/2006 · Norther 5/10/2009 · Rentel …
supportsConcession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Trade press2
[7]
CMS Law2024◆ CMS Expert Guide - Offshore wind in Belg…
“Rentel received its domain concession on June 4, 2009 for an area between Thornton Bank and Lodewijk Bank, with a capacity of 309 MW. The Green Certificate scheme provides support for 20 years. For Re…”
supportsoperatorConsentMechanismDetailConsent granted
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed