Norther

Belgian EEZ, ~23 km from Zeebrugge, near Dutch EEZ border. Shareholders: Elicio (50%), Eneco (25%), Diamond Generating Europe/Mitsubishi (25%).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2010’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Norther NVBelgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) Oct 2009 · auction recordView the source for Consent grantedConsent granted 2011 View the source for Final investment decisionFinal investment decision Dec 2016 View the source for Offshore constructionOffshore construction Aug 2018 View the source for First powerFirst power 2019-Q1 View the source for Commercial operationCommercial operation May 2020 Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Norther NV 2009-10 ORIGINATION — stake not disclosed · closed 2016-12 2016-Q1 JV ENTRYTODAYNorther NV — 100% today · operator Norther NV Norther NV 100%Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to Norther NV
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 201920192020-05 · 3 recorded revisions · slipped +0.9 yr (first announced 2019)

Revenue & offtake contract duration and price levels · money of the day

370 MW contracted — concession
Concession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Price€124/MWh ·Capacity370 MWAwardedOct 2009
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations44 of 44100% · first seen 2018-08-07 · 2 more than the record expects — a met mast, a platform not on the register, or a survey artefact
Turbines46 of 44105% · first seen 2018-08-22
Latest count2021-12-31from 891 satellite passes · 1 substation platform left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (44 turbines + 1 platform); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
1020304045 planned (turbines and platforms)latest count 2021-12-31foundations — running total, confirmedAug 2018 — 6 this month · 6 in totalSep 2018 — 13 this month · 19 in totalOct 2018 — 14 this month · 33 in totalNov 2018 — 10 this month · 43 in totalFeb 2019 — 1 this month · 44 in totalMar 2019 — 1 this month · 45 in totalApr 2019 — 0 this month · 45 in totalMay 2019 — 2 this month · 47 in totalturbines up — running total, confirmedAug 2018 — 1 this month · 1 in totalSep 2018 — 0 this month · 1 in totalOct 2018 — 0 this month · 1 in totalNov 2018 — 0 this month · 1 in totalFeb 2019 — 14 this month · 15 in totalMar 2019 — 14 this month · 29 in totalApr 2019 — 16 this month · 45 in totalMay 2019 — 2 this month · 47 in total47 foundations47 turbines upAug 2018Sep 2018Oct 2018Nov 2018Feb 2019Mar 2019Apr 2019May 2019
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed47 confirmed · 0 not yet confirmedas counted on 2021-12-31 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Ostend installation base
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (47)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Norther, 2026-09-07
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationNorther OHVS·33/220 kV · in service 2019 · owner Norther NV (the wind farm project company — NOT Elia)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201920202021developer’s stated start 2020-Q2nowNorther OHVSNorther OHVSin service 2019in service 2019

Sources & verification

16/18 fields verified · rests on 9 sources (3 primary) · ◆ 6 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[1]
Belgian Offshore Platform2016-12-19◆ Belgium's largest offshore wind turbine …
“50% Elicio, 25% Eneco and 25% Diamond Generating Europe comprise the partnership responsible for developing and operating the wind park. Financial close date: 19 December 2016. The installation compri…”
supportsoperatorFinal investment decisionTurbinesModelUnit capacity+2 more
[3]
Green Giraffe Advisory2020-05-27◆ Norther reaches technical completion and…
“On 27th May 2020 the Norther offshore wind farm officially transitioned to its operational phase as it reached technical completion. Norther is owned by three shareholders: Elicio NV holds 50%, with E…”
supportsCommercial operationCOD history
[12]
Norther NV2026-08-23◆ Norther NV - Shareholders
“Elicio NV is a 50% shareholder, via its fully owned vehicle Elnu NV. Elicio, a 100% subsidiary of Nethys, is a Belgian developer and operator of offshore and onshore wind farms. ... Eneco is a 50% sha…”
supports↳ parent
Financier1
[10]
European Investment Bank2016-05-18
“By virtue of its technical characteristics the project would fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU, amended 2014/52/EU), where the national authorities…”
supportsConsentConsent granted
Auction results1
[13]
RBINS / MUMM (Brabant, Degraer & Rumes, 2011 — Offshore wind farms in the Belgian part of the North Sea, ch. 2)2011◆ rbins-mumm-2011-belgian-owf-ch2
Table 1, "Overview of the dates when the projects were granted a domain concession and an environmental permit": C-Power 27/06/03 · Belwind 5/6/2007 · Eldepasco 15/5/2006 · Norther 5/10/2009 · Rentel …
supportsConcession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Trade press4
[2]
Power Technology2020
Press report — cited, not quoted; read it at the source link.
supportsFoundationStatusConnection pointWater depthCoordinates
[5]
Windtech International2019-03-01◆ Windtech International - Norther offshor…
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionFirst power
[8]
IEA (citing Belgian Royal Decree)2018-01◆ Green Certificate Scheme - Federal – Pol…
“LCOE = 138 EUR/MWh (129,80 EUR/MWh for installations covered by the domanial concession granted to Rentel SA/NV, 124,00 EUR/MWh for installations covered by the domanial concession granted to Norther …”
supportsMechanismDetail
[11]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed