Tra Vinh V1-2 (Truong Long Hoa)
Operating nearshore wind farm off Tra Vinh.
Status
Operationallifecycle stage
Ownership
SESermsang — 80% ◆
TTTruong Thanh — 20% ◆
Location
South China Sea
Technology
Capacity
48 MW ◇
Turbines
12 × 4.5 MW ◇
Model
Goldwind Gw155 4-5 ◇
Foundation
Monopile ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–1 m ≈
Wind speed
6.6 m/s @ 100 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
2021 ◇
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
2 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 8 sources · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[4]
Sermsang Power Corporation2026-07-03
“Truong Thanh Tra Vinh Wind Power Joint Stock Company (TTTV) ... % Share: 80% ... Installed Capacity/PPA (MW): 48 MW ... COD / SCOD Date: 25 October 2021”
supportsowner
Trade press7
[1]
offshoreWIND.biz2021
Press report — cited, not quoted; read it at the source link.
supportsConsentFinal investment decisionCommercial operationTotal capacity
[2]
[3]
offshoreWIND.biz2021
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityFoundation
[5]
Thailand Construction and Engineering News2020-08-31
“Construction of the V1-2 wind power plant – a joint venture between the Truong Thanh Vietnam Group and the Thai-based Sermsang Power Corporation Public Company Limited – kicked off in the Mekong Delta…”
supportsowner
[6]
[7]
[8]
Radio Free Asia (RFA) Vietnamese2020-08-14◆ Nhà máy điện gió V1-2 được khởi công tại…
Copyrighted source — cited, not quoted; read it at the source link.
supportsConstruction startSite rights