Tan Phu Dong 1 (Tien Giang)
Tan Phu Dong 1 (Tien Giang) is an offshore wind farm in the South China Sea, Vietnam, owned by Gia Lai Electricity JSC, in operation since 31 May 2023.
Status
Operationallifecycle stage
Ownership
GLGia Lai Electricity JSC — 100% ◇
Location
South China Sea
Technology
Capacity
100 MW ◇
Turbines
24 × 4.2 MW ◆
Model
Vestas V150 4-2 ◆
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–3 m ≈
Wind speed
6.5 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
31 May 2023 ◇
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
1 dated milestone on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 9 sources (1 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
OEM1
[7]
Vestas2022-03-29
“Vestas has secured a 100 MW order in Vietnam for an undisclosed project. ... Located near the shorelines of the Mekong Delta, the wind farm includes 24 Vestas V150-4.2 MW wind turbines with a number d…”
supportsTurbinesModelUnit capacity
Trade press8
[1]
[2]
[3]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsTurbines
[4]
[5]
[6]
Infinity Logistics2022
“Technical Specs: Wind turbine: Vestas V150 - 4.2 MW Quantity: 24 WTGs. [Project: Tan Phu Dong I offshore wind farm project. Period: 08/2022 - 11/2022. POL: Phu My Port. POD: Tien Giang.]”
supportsTurbinesModelUnit capacity
[8]
Doanh Nhân (Báo Pháp luật Việt Nam), reporting GEG's 2025 AGM disclosure2025-04-17◆ Điện Gia Lai (GEG) đặt mục tiêu lợi nhuậ…
Copyrighted source — cited, not quoted; read it at the source link.
supportsCommercial operation
[9]
Tuổi Trẻ2023-06-01◆ Hai nhà máy điện gió hụt giá ưu đãi được…
Copyrighted source — cited, not quoted; read it at the source link.
supportsCommercial operation