WindFloat Atlantic

Located 20 km offshore Viana do Castelo. WindPlus consortium: Ocean Winds 79.4% (EDPR 54.4% + ENGIE 25%), Repsol 19.4%, Principle Power 1.2%.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

6 dated milestones on the spine, each with its source · 3 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the FiT contract's terms · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 12 sources (9 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator7
[1]
Windplus S.A. (WindFloat Atlantic project)2024
“WindFloat Atlantic is composed of 3 semi-submersible WindFloat platforms, each with a MHI Vestas 8.4 MW wind turbine, 20 km off the coast of Viana do Castelo at a sea depth of approximately 95 meters.”
supportsTurbinesModelUnit capacityTotal capacityFoundation+4 more
[2]
EDP2020-07-26
“WindFloat Atlantic, which has total installed capacity of 25 MW is the world's first semi-submersible floating wind farm and the first floating wind farm in continental Europe.”
supportsBackground
[3]
Principle Power Inc.2020-01-02◆ WindFloat Atlantic project starts supply…
"the first of the three platforms comprising the Windplus consortium's wind farm, was successfully connected on 31st December." ... The first platform of the WindFloat Atlantic wind farm, after being …
supportsFirst power
[4]
Principle Power Inc.2020-07
"three platforms, each with one 8.4-MW MHI Vestas turbine installed… the first semi-submersible floating wind farm in the world." ... The last platform of WindFloat Atlantic has been connected to the …
supportsCommercial operationCOD history
[10]
Principle Power Inc.2019-10
"The first WindFloat Atlantic platform with the turbine fully installed has set off from the Spanish Port of Ferrol towards its final destination 20 km off the coast of Viana do Castelo in Portugal." …
supportsOnshore constructionOffshore constructionSite rightsturbine assembly and departure
[12]
Ocean Winds2025◆ Five years of WindFloat Atlantic (timeli…
“2015-2018 Development and Permitting Necessary permits were obtained, including: ... The environmental permit was received in November 2015. ... The 30-year maritime concession for the WindFloat Atlan…”
supportsConsentConsent granted
[14]
Ocean Winds2025-05-14◆ Ocean winds celebrates 5 years of the wi…
“After five years of operation, we are proud of the performance of the WindFloat Atlantic project in producing clean energy. ... Today, we are now even more confident that the investment decision made …”
supportsFinal investment decision
Financier1
[5]
European Investment Bank2018-10-19◆ Portugal: EU supports breakthrough wind …
"EUR 60 million loan granted by the EIB under InnovFin to Windplus [S.A.]… EUR 29.9 million from the EU's NER300 programme and up to EUR 6 million from the Portuguese Carbon Fund." [Note: loan signing…
supportsBackground
Trade press4
[7]
offshoreWIND.biz2024-08-06◆ Tokyo Gas Makes First Investment in Over…
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[9]
Windletteren (trade newsletter)2024
“the Portuguese pilot project WindFloat Atlantic (3 wind turbines, 25 MW), which has a tariff of €168/MWh”
supportsMechanismDetail
[11]
GEBCO Compilation Group2020
supportsWater depth
[13]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.