Tablas Strait Offshore Wind Power Project 1
Alternergy WESC (bought out Shell's stake Nov 2024).
Status
Proposedlifecycle stage
Ownership
TSTablas Strait Offshore Wind Power Corporation — 100% ◇
Location
Philippine Internal Seas
Technology
Capacity
600 MW ◇
Turbines
—
Foundation
Floating ◇
Site & conditions
Site rights
Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project ∅
Water depth
95–372 m ≈
Wind speed
8.9 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Not taken
COD · developer
—
Delivery outlook not forecast
We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
the dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 6 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[1]
Auction pipeline1
[6]
Department of Energy (Philippines)2026
DOE GEA-5 — first offshore-wind-only Green Energy Auction; NOA/TOR 25 Nov 2025; 3,300 MW fixed-bottom OSW; GEAR PhP 11.00/kWh; awards targeted H2 2026.
supportsGreen Energy Auction GEA-5 (offshore wind)
Trade press4
[2]
[3]
4C Offshore2025
Press report — cited, not quoted; read it at the source link.
supportsFoundation
[4]
[5]