Egmond aan Zee (OWEZ)
Located 10-18 km off Egmond aan Zee coast, North Holland. Originally NoordzeeWind JV (Shell 50% / Nuon 50%). Shell acquired 100% in March 2021.
Technology
Capacity
108 MW ◆
Turbines
36 × 3 MW ◆
Model
Vestas V90 3-0 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
13–17 m ≈
Distance from shore
14 km ◆
Wind speed
9.3 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◆
Grid
No agreement ◆
Connection
Wijk aan Zee (onshore substation; three 34 kV submarine export … ◆
Schedule
FID
2005 ◆
COD
2007 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
4 dated milestones on the spine, each with its source · 2 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 10 sources (6 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[5]
[6]
Noordzeeloket (RWS / Ministry of Infrastructure and Water Management)
“36 wind turbines at 3 MW each. Total output: 108 MW. Commissioned: 2007. Operating until: 2031. Off the coast of North Holland. Surface area: 27 km². The electricity is brought to land near Wijk aan Z…”
supportsTurbinesUnit capacityTotal capacityStatusConnection point
Trade press8
[1]
[2]
[3]
[4]
EgmondOnline.nl◆ The Egmond aan Zee Offshore Wind Farm | …
“In spring 2002, NoordzeeWind was selected as the winning party and in July of that year, NoordzeeWind signed the concession agreement with the government for the realization of the park. At the end of…”
supportsFinal investment decisionFirst power
[9]
[10]
[11]
windfair.net2006-04-21
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rights
[12]