Nyuzen Offshore Wind Farm
Located offshore Nyuzen Town, Toyama Prefecture. Installation by Shimizu Corp vessel Blue Wind.
Status
Operationallifecycle stage
Ownership
VJVenti Japan — 100% ◇
Location
Sea of Japan (East Sea)
Technology
Capacity
9 MW ◇
Turbines
3 × 3 MW ◆
Model
Mingyang Myse3 0-135 ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–17 m ≈
Wind speed
6.0 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◆
Grid
Not recorded ◇
Connection
Grid connection secured ◇
Schedule
FID
Taken · date not recorded ∴
COD
22 Sep 2023 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
4 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the FiT contract's terms · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 11 sources (2 primary) · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[5]
JFE Engineering Corporation2023-10-17
“本年9月22日より運転を開始いたしました ... 2022年10月から建設工事を進めていた ... 3,000kW級風車を3基設置(出力制御により最大出力7,495kWとして運用)”
supportsConsentFinal investment decisionOnshore constructionOffshore constructionFirst power+4 more
[11]
Agency for Natural Resources and Energy, METI (資源エネルギー庁)2026-08-31◆ 再生可能エネルギー事業計画認定情報 公表用ウェブサイト — 16 富山県 (20…
“UZ99447D16 | 入善マリンウィンド合同会社 | 株式会社ウェンティ・ジャパン 職務執行者 佐藤 裕之 | 富山県下新川郡入善町横山1818-1 | 018-827-7435 | 洋上風力 | 7495 | 富山県下新川郡入善町入善字猿角場5754-149 | 4 | - | 43459 | - | 2023年11月 | - | - | - | 開示不同意 | 2042年11月”
supportsMechanismDetail
Trade press8
[2]
4C Offshore (TGS)2026-07-02
Press report — cited, not quoted; read it at the source link.
supportsoperatorStatusConnection pointCoordinates
[3]
[4]
offshoreWIND.biz2023
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[6]
WindJournal2023-09-01
“4月3日から風車の基礎を海底に打設する工事を開始した”
supportsOnshore constructionOffshore constructionSite rights
[7]
WindJournal2023-10-23
“3基の風車の商業運転を9月22日に開始した ... 10月17日には関係者が出席して完成を祝う式典が開かれた”
supportsCommercial operation
[8]
[9]
[10]
環境金融研究機構 (RIEF)2023
“明陽智慧能源集団(明陽智能)が開発した設備を、日本で初めて採用した...一基3000kW級の発電タービン3基で構成する”
supportsTurbinesModel
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depthCoordinates