Kamisu Nearshore Phase 2
Located adjacent to Phase 1 off Kashima Port, Ibaraki Prefecture.
Status
Operationallifecycle stage
Ownership
WCWind Power Co — 100% ◇
Location
Northwest Pacific
Technology
Capacity
16 MW ◆
Turbines
8 × 2 MW ◆
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
3–11 m ≈
Wind speed
6.9 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◆
Grid
Not recorded ◆
Connection
Grid connection secured ◆
Schedule
FID
Taken · date not recorded ∴
COD
2013-Q4 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
2 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the FiT contract's terms · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 8 sources (2 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[6]
Wind Power Co., Ltd. (ウィンド・パワー株式会社)
“稼働開始 平成25年3月 ... 出力2,000kW × 8基/ 総出力16,000kW”
supportsFirst powerTurbinesUnit capacity
[7]
[8]
国土交通省 関東地方整備局 鹿島港湾・空港整備事務所 (MLIT Kashima Port and Airport Development Office)2018-04
“発電を行う風車は護岸から約50mの位置に建設されており、第1発電所の7基と第2発電所の8基、合計15基が現在稼働しています。”
supportsTurbines
Trade press3
[3]
[4]
4C Offshore2023◆ Kamisu Nearshore Wind Farm - phase 2 Off…
Press report — cited, not quoted; read it at the source link.
supportsConsentFinal investment decisionCommercial operationSite rightsTotal capacity+4 more
[5]
4C Offshore2026
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
Unverified import1
[1]
unknown◆ Kamisu Nearshore Wind Farm - phase 2 Off…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depth
Encyclopaedic1
[2]