Part of the broader Sud-Atlantique offshore wind initiative. Located approximately 40 km off Ile d'Oleron in the Bay of Biscay, covering 180 km2.

Status
On Holdlifecycle stage
FragileHafrok completion outlook
Ownership
Location
France
Northeast Atlantic
Technology
Capacity 1,000 MW 
Turbines
Foundation
Site & conditions
Site rights State-designated France AO10 (pluriannual offshore tender, ~10 GW) 
Water depth 60–60 m  Distance from shore 40 km  Wind speed 8.4 m/s @ 150 m 
Revenue & grid
Offtake Other  Grid No agreement · 2025-03  Connection RTE-Nexans HVDC cable framework agreement (announced 25 March … 
Schedule
FID Not taken
COD · Hafrok

Delivery outlook modelled by Hafrok · calibrated on delivered projects

on hold — no credible date; the chart shows when a restarted project might complete
Chance of delivery
≈14% estimated chance this project reaches commercial operation
Projects put on hold complete ≈15% of the time on Hafrok's record. A secured offtake contract lifts this one slightly; a market with a thinner delivery record, its size and technical complexity pull a little the other way. Only a restart would change that — there is no dated schedule to judge against.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2030: 20.0% (conditional on completion) 2031: 20.0% (conditional on completion) 2032: 20.0% (conditional on completion) 2033: 20.0% (conditional on completion) 2034: 20.0% (conditional on completion)2026now20272028202920302031203220332034
COD probability by year, conditional on completion
YearProbability
203020.0%
203120.0%
203220.0%
203320.0%
203420.0%
How Hafrok got this date
1
On hold — no dated schedule
The project is recorded as On Hold, so no sequence of milestones can be trusted. Hafrok publishes no expected year; the chart instead spreads the remaining chance of completion over the years a restarted project might finish in.
2
Chance of delivery — separate from timing
Start from the share of On Hold projects that went on to complete — ≈15%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Historically only a minority of projects put on hold returned to delivery — the estimate reflects that. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈14%, which rates it Fragile on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Revenue & offtake route to market — open

No offtake secured — route to market open

AO7 French offshore CRE tender — zero bids submitted by April 2025 deadline; tender officially failed September 2025. No offtake contract awarded.

The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Next visible round · from the auction calendar
France AO10 (pluriannual offshore tender, ~10 GW)
expected 2027 · scheduled · the round names this project
LAUNCHED 11-12 June 2026 (call-for-tenders notice + CRE technical specs); bid deadline 12 Oct 2026; CRE opinion early 2027; ministerial award Feb 2027.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageOn Hold
Offshore constructionnot started
Expected start of operationnot stated
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
HVDC systemOleron HVDC (Offshore)·1250 MW · ±320 kV · ordered, expected 2033
HVDC systemOleron HVDC (Onshore)·1250 MW · ±320 kV · ordered, expected 2033
Export & onshore
Export cableOleron Export Cable·HVDC subsea · Nexans · planned · to Onshore converter (TBD)
Converter supplierHitachi Energy·Oleron HVDC (Offshore) · Chantiers de l'Atlantique (Saint-Nazaire) · for RTE
Converter supplierHitachi Energy·Oleron HVDC (Onshore) · Chantiers de l'Atlantique (Saint-Nazaire) · for RTE
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20262027202820292030203120322033nowOleron HVDC (Offshore)Oleron HVDC (Offshore)expected 2033expected 2033Oleron HVDC (Onshore)Oleron HVDC (Onshore)expected 2033expected 2033Oleron Export CableOleron Export Cableexpected 2033expected 2033

Sources & verification

1/14 fields verified · rests on 8 sources (3 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[2]
RWE2023-08-31◆ RWE and VALOREM have partnered to jointl…
“AO7 South Atlantic offshore wind project: approximately 1,000 MW installed capacity, some 40 kilometres off the coast of Oléron Island, water depth around 60 metres average, maximum project area 180 k…”
supportsTotal capacityWater depthDistance from shore
[6]
Nexans2025-03-25◆ Nexans wins major frame agreement with r…
“Nexans has secured a major framework agreement with RTE for the design, manufacturing, and supply of HVDC cables, which will be used to connect the Centre Manche 1 & 2 and Oléron offshore wind farms t…”
supportsStatusConnection point
[7]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 807 (node--type-project) at /facades-maritimes-en-france/facade-sud-atlantique/oleron/oleron-1 — title 'Oleron 1'; page text 5836 chars, hash b714449db0b63eea…. Identifying text: Le parc…”
supportsRegister entry
Auction pipeline1
[8]
CRE2026◆ cre-ao10-avis
CRE avis on the AO10 cahier des charges — one procedure, ~11 parks / ~10 GW, fixed + floating.
supportsFrance AO10 (pluriannual offshore tender, ~10 GW)
Trade press4
[1]
Offshore Wind Biz2025-09-24◆ No Bids Submitted for 1 GW Oléron Offsho…
Press report — cited, not quoted; read it at the source link.
supportsConsentCOD historyTotal capacityMechanismDetail+2 more
[3]
Enerdata2022
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[4]
Global Energy Monitor2026-07-02
supportsCoordinates
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed