Shandong Bandaonan U1 Phase 1
Phase 1 of SPIC's 900 MW Bandaonan U1 site, in the sea south of Rushan, Weihai, Shandong.
Status
Operationallifecycle stage
Ownership
SIState Power Investment (Rushan) Offshore Wind Power ◇
Location
Yellow Sea
Technology
Capacity
450 MW ◇
Turbines
53 ◆
Maker
Mingyang (model not recorded) ◆
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
25–31 m ◆
Distance from shore
24 km ◆
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
17 Nov 2023 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
2 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 7 sources · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[3]
山东省能源局 (Shandong Provincial Energy Bureau)2023-11-22◆ 国家电投山东能源半岛南U1场址一期全容量并网发电
“近日,在威海乳山南侧海域,随着最后一台风机完成并网调试,国家电投山东能源半岛南U1场址 90万千瓦海上风电项目一期全容量并网发电。据悉,一期工程装机规模45万千瓦…配套1座海上升压站 及陆上集控中心,布局53台单机容量8.5兆瓦风电机组…配置明阳智能MySE8.5-230型号半直驱风机… 项目于2022年12月31日取得核准;2023年11月17日,实现全容量并网。 [EN] Recently, …”
supportsConsentCommercial operationTurbinesMakerConsent granted
[4]
山东省能源局 (Shandong Provincial Energy Bureau)2023-03-02◆ 国家电投半岛南U场址海上风电项目 (900MW, 两期)
“国家电投半岛南U场址海上风电项目,位于威海乳山南侧海域,场址中心距离海岸24公里,平均水深 25—31米…总投资100亿元,总装机容量900兆瓦,分两期建设,一期投资53亿元,布局53台单机容量 8.5兆瓦风电机组,配套1座220千伏海上升压站及陆上集控中心…二期拟建设53台单机容量8.5兆瓦 风电机组。 [EN] SPIC's Bandaonan U site offshore wind pro…”
supportsWater depthDistance from shore
Trade press5
[1]
Global Energy Monitor2026◆ Shandong Bandaonan U Offshore wind farm
supportsoperatorFinal investment decisionCommercial operationSite rightsTotal capacity+2 more
[2]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] Offshore floating: are an emerging technology designed for installation in de…”
supportsFoundation
[5]
[6]
[7]