Huaneng Qidong Offshore
Located off Qidong, Nantong, at the Yangtze River mouth. 114.5 km2 site. Annual generation ~2.2 TWh.
Status
Operationallifecycle stage
Ownership
CHChina Huaneng Group — 100% ◇
Location
East China Sea
Technology
Capacity
802 MW ◇
Turbines
134 ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–4 m ≈
Wind speed
7.2 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◇
Grid
Not recorded ◇
Connection
220 kV offshore booster station to Qidong onshore substation ◇
Schedule
COD
25 Dec 2021 ◇
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
2 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the FiT contract's terms · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 6 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[2]
offshoreWIND.biz2021-12
Press report — cited, not quoted; read it at the source link.
supportsoperatorConstruction startCommercial operationSite rightsTurbines+3 more
[3]
[4]
[5]
[6]
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTurbinesTotal capacity