Fujian Putian Pinghai Bay
Fujian Putian Pinghai Bay. GEM records phase DE Area 400 MW construction.
Technology
Capacity
400 MW ◆
Turbines
28 ◆
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held ∴
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
2025 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
3 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 4 sources (2 primary) · ◆ 4 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[3]
China Three Gorges Renewables (Group) Co., Ltd. (SSE: 600905)2026-04-30◆ CTG Renewables 2025 annual report
“莆田平海湾海上风电场 DE 区项目 福建省 400 470,194.00 自筹、
借款
已实现全
容量并网
发电”
supportsConstruction startFirst powerCommercial operationSite rightsTotal capacity
[4]
China Three Gorges e-procurement platform (Haixia Power)2024-12-05◆ Putian Pinghai Bay 400MW offshore wind f…
“本招标项目莆田平海湾海上风电场DE区项目EPC总承包项目已获批准建设,建设资金来自自有资金和自筹资金,招标人为海峡发电有限责任公司 … 风电场场址拟布置 8台上海电气8.5MW风电机组、8台上海电气16.6MW风电机组以及金风科技12台16.6MW风电机组,总装机容量400MW … 计划2025年1月项目主体工程开工,2025年4月具备首批风机吊装条件,2025年7月具备首批机组并网条件,2025…”
supportsConsentTurbinesTotal capacity
Trade press2
[1]
Global Energy Monitor2026◆ Fujian Putian Pinghai Bay offshore wind …
supportsoperatorFinal investment decisionConstruction startSite rightsTotal capacity+2 more
[2]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] Offshore floating: are an emerging technology designed for installation in de…”
supportsFoundation