# Vineyard Wind 1

Source: https://hafrok.com/projects/us-vineyard-wind-1/  
Data as of: 2026-10-13

Located approximately 24 km south of Nantucket, Massachusetts (14 miles / 23 km southeast of Martha's Vineyard per BOEM ROD).

| Field | Value |
|---|---|
| Country | United States |
| Sea basin | Northwest Atlantic |
| Capacity | 806 MW |
| Turbines | 62 |
| Lifecycle stage | Operational |
| Owners | Avangrid Renewables (Iberdrola) · CIP |
| Coordinates | 41.35, -70.5 |
| Commercial operation (announced) | 2026-04-24 |

## Milestones

- **Consent granted** — 2021-05 (achieved)
- **Final investment decision** — 2021-09-15 (achieved)
- **Onshore construction** — 2021-11 (achieved)
- **Offshore construction** — 2023-06 (achieved)
- **First power** — 2024-01-02 (achieved)
- **Commercial operation** — 2026-04-24 (achieved)

## Offtake

800 MW contracted — utility PPA

- **Utility PPA · Massachusetts Section 83C Round 1** — $74/MWh · awarded 2018-05

## Sources

Every figure above traces to one of these. Quoted passages are held but not republished; follow the link for the original wording.

- U.S. Department of the Interior / BOEM, 2021-05-11 — https://www.doi.gov/pressreleases/biden-harris-administration-approves-first-major-offshore-wind-project-us-waters
- U.S. Department of the Interior / BOEM, 2021-05-11 — https://www.doi.gov/pressreleases/biden-harris-administration-approves-first-major-offshore-wind-project-us-waters
- Bureau of Ocean Energy Management, 2015-04-01 — https://www.boem.gov/renewable-energy/state-activities/massachusetts-leases-ocs-0500-bay-state-wind-and-ocs-0501
- Vineyard Wind (Avangrid / CIP), 2021-09-15 — https://www.vineyardwind.com/press-releases/2021/9/15/vineyard-wind-1-becomes-the-first-commercial-scale-offshore-wind-farm-in-the-us-to-achieve-financial-close
- Vineyard Wind (Avangrid / CIP), 2024-01-03 — https://www.vineyardwind.com/press-releases/2024/1/3/cip-avangrid-announce-first-power-from-nation-leading-vineyard-wind-1-project
- Vineyard Wind (Avangrid / CIP), 2023-06-07 — https://www.vineyardwind.com/press-releases/2023/6/7-vw-begins-turbine-foundation-installation
- offshoreWIND.biz, 2026-03-16 — https://www.offshorewind.biz/2026/03/16/construction-of-vineyard-wind-1-completed/
- The Martha's Vineyard Times, 2026-03-03 — https://www.mvtimes.com/2026/03/03/vineyard-wind-construction-nears-completion/
- Vineyard Wind, 2020-10-29 — https://www.vineyardwind.com/press-releases/2020/10/29/vineyard-wind-reaches-transmission-agreement-with-iso-ne
- Energy & Climate Counsel, 2018-05-24 — https://www.energyclimatecounsel.com/2018/05/24/massachusetts-selects-vineyard-wind-in-83c-rfp/
- Union of Concerned Scientists, 2018-08-01 — https://blog.ucs.org/john-rogers/low-price-offshore-wind-massachusetts/
- BOEM, 2024-02 — https://www.boem.gov/sites/default/files/documents/oil-gas-energy/leasing/Swiler%20Table%20-%20Offshore%20Wind%20Competitive%20Lease%20Sales.pdf
- Bureau of Ocean Energy Management, 2021-07-15 — https://www.boem.gov/renewable-energy/state-activities/massachusetts-leases-ocs-0500-bay-state-wind-and-ocs-0501
- The Vineyard Gazette, 2024-07-18 — https://vineyardgazette.com/news/2024/07/18/vineyard-wind-project-shut-down-over-broken-blade-setback
- Utility Dive, 2024-07-16 — https://www.utilitydive.com/news/vineyard-wind-blade-failure-debris-nantucket-suspended/721814/
- WBUR, 2024-08-01 — https://www.wbur.org/news/2024/08/01/massachusetts-vineyard-wind-nantucket-debris
- Wind Watch (via AP / OSW press), 2024-10-23 — https://www.wind-watch.org/news/2024/10/23/vineyard-wind-taking-down-more-blades-following-inspections/
- offshoreWIND.biz, 2025-03-04 — https://www.offshorewind.biz/2025/03/04/lightning-strike-zaps-damaged-vineyard-wind-1-turbine/
- Nantucket Current, 2025-07-11 — https://nantucketcurrent.com/news/town-reaches-10-5-million-settlement-with-ge-vernova-over-vineyard-wind-blade-failure
- offshoreWIND.biz, 2019-08-13 — https://www.offshorewind.biz/2019/08/13/boem-further-delays-vineyard-wind-eis-decision/
- Federal Register (BOEM), 2020-06-12 — https://www.federalregister.gov/documents/2020/06/12/2020-12822/notice-of-availability-of-a-supplement-to-the-draft-environmental-impact-statement-for-vineyard-wind
- Vineyard Wind, 2020-12-14 — https://www.vineyardwind.com/press-releases/2020/12/14/vineyard-wind-statement-on-boems-acknowledgement-of-temporary-cop-withdrawal
- offshoreWIND.biz, 2026-01-28 — https://www.offshorewind.biz/2026/01/28/court-clears-vineyard-wind-1-to-continue-construction/
- The Energy Mix, 2024-08 — https://www.theenergymix.com/shattered-turbine-blade-at-vineyard-wind-was-produced-in-gaspe-quebec/
- offshoreWIND.biz, 2025-01-21 — https://www.offshorewind.biz/2025/01/21/canada-made-ge-vernova-blades-to-be-removed-from-vineyard-wind-1-site/
- Vineyard Wind, 2025 — https://www.vineyardwind.com/partners
- Vineyard Wind (Avangrid / CIP), 2021-11-19 — https://www.vineyardwind.com/press-releases/2021/11/19/vineyard-wind-breaks-ground-on-first-in-the-nation-commercial-scale-offshore-windfarm
- The New Bedford Light, 2026-06-01 — https://newbedfordlight.org/judge-rules-again-for-vineyard-wind-in-its-dispute-with-ge-vernova/
- DTU Wind Energy / World Bank (Global Wind Atlas), 2026 — https://globalwindatlas.info/
- Vineyard Wind, 2018-05-23 — https://www.vineyardwind.com/news-and-updates/2018/5/23/vineyard-wind-selected-to-negotiate-contracts-to-deliver-clean-offshore-wind-power-to-massachusetts-electricity-customers
- WBUR, 2025-07-25 — https://www.wbur.org/news/2025/07/25/vineyard-wind-turbines-construction
- Iberdrola SA, 2025 — https://www.iberdrola.com/documents/20125/41740/Iberdrola_factbook_2025.pdf
- Bureau of Ocean Energy Management (BOEM), 2026-08-23 — https://www.federalregister.gov/agencies/ocean-energy-management-bureau
- GE Vernova, 2026-09-16 — https://www.gevernova.com/news/press-releases/vineyard-wind-ge-vernova-announce-resolution-commercial-litigation
- offshoreWIND.biz, 2026-09-17 — https://offshorewind.biz/2026/09/17/vineyard-wind-ge-vernova-settle-dispute-ge-withdraws-termination-notice