Located off the coast of Loire-Atlantique in the Bay of Biscay. Ten years from tender to commissioning.

| Field | Value |
|---|---|
| Country | France |
| Sea basin | Northeast Atlantic |
| Capacity | 480 MW |
| Turbines | 80 |
| Lifecycle stage | Operational |
| Owners | EDF Renewables · EIH S.a r.l. |
| Coordinates | 47.16, -2.628 |
| Commercial operation (announced) | 2022-11 |

## Milestones

- **Consent granted** — 2019-06 (achieved)
- **Onshore construction** — 2019-09 (achieved)
- **Final investment decision** — 2019-10 (achieved)
- **Offshore construction** — 2021-05 (achieved)
- **First power** — 2022-06 (achieved)
- **Commercial operation** — 2022-11 (achieved)

## Offtake

480 MW contracted — tender award

- **Tender award · France Offshore Wind Round 1 (AO1)** — €143.6/MWh · awarded 2012-04 · 20-year term

## Sources

Every figure above traces to one of these. Quoted passages are held but not republished; follow the link for the original wording.

- PR Newswire (EDF Renewables / Enbridge / CPP Investments joint release), 2022-11-23 — https://www.prnewswire.com/news-releases/edf-renewables-enbridge-and-cpp-investments-announce-frances-first-offshore-wind-project-saint-nazaire-is-now-fully-operational-301685809.html
- Power Technology, 2022-11 — https://www.power-technology.com/projects/saint-nazaire-wind-farm/
- Power Technology, 2022-11 — https://www.power-technology.com/projects/saint-nazaire-wind-farm/
- Offshore Wind (offshorewind.biz), 2022-11-23 — https://www.offshorewind.biz/2022/11/23/frances-first-offshore-wind-farm-fully-up-and-running/
- IPP Journal, 2019-10 — https://ippjournal.com/update/edf-enbridge-close-financing-of-480-mw-saint-nazaire-offshore-wind-power-plant-off-the-coast-of-the-guerande-peninsula
- Offshore Wind (offshorewind.biz), 2019-06-07 — https://www.offshorewind.biz/2019/06/07/french-offshore-wind-farm-clears-final-legal-hurdle/
- Heavy Lift News, 2021-05 — https://www.heavyliftnews.com/first-foundation-at-le-parc-eolien-en-mer-de-saint-nazaire/
- Nantes Saint-Nazaire Port Authority, 2021 — https://www.nantes.port.fr/en/news/delivery-electrical-substation-banc-de-guerande-wind-farm
- Offshore Engineer (OE Digital), 2020-05-07 — https://www.oedigital.com/news/478286-enbridge-sells-stakes-in-french-offshore-wind-projects
- The Wind Power, 2026-05 — https://www.thewindpower.net/windfarm_fr_16526_saint-nazaire.php
- European Commission, 2019-07 — https://ec.europa.eu/commission/presscorner/detail/en/ip_19_4749
- Enbridge, 2022-11 — https://www.enbridge.com/media-center/news/details-saint-nazaire
- DTU Wind Energy / World Bank (Global Wind Atlas), 2026 — https://globalwindatlas.info/
- Societe Parc du Banc de Guerande (EDF EN / Eolien Maritime France), 2015 — http://www.prosimar.org/EP%20eole/Piece3_SNA_Demande_concession_DPM_Janvier%202015.pdf
- reNEWS, 2019-06-14 — https://renews.biz/53740/edf-innogy-enbridge-take-600mw-dunkirk-spoils/
- DGEC — Ministère de la Transition écologique (eoliennesenmer.fr), 2026-08-25 — https://www.eoliennesenmer.fr/facades-maritimes-en-france/facade-nord-atlantique-manche-ouest/saint-nazaire
- Parc du Banc de Guérande (Parc éolien en mer de Saint-Nazaire), date not stated — https://parc-eolien-en-mer-de-saint-nazaire.fr/faq/quel-est-le-cout-du-projet/
- Parc du Banc de Guérande SAS (comptes annuels déposés au greffe, via Pappers), 2025-07-01 — https://www.pappers.fr/entreprise/parc-du-banc-de-guerande-519081509/comptes/PARC%20DU%20BANC%20DE%20GUERANDE%20-%20Comptes%20sociaux%202024%2001-07-2025.pdf
- Commission de régulation de l'énergie / DGEC (published by the CPDP Courseulles), 2026-10-13 — https://cpdp.debatpublic.fr/cpdp-courseulles/DOCS/APPEL_D_OFFRES/APPEL_D_OFFRE.PDF

---

Hafrok · https://hafrok.com/projects/fr-saint-nazaire/ · please cite the page you took a figure from.