---
title: "Hainan Lingao"
source: https://hafrok.com/projects/cn-hainan-lingao/
identifier: cn-hainan-lingao
updated: 2026-10-13
---

# Hainan Lingao

Source: https://hafrok.com/projects/cn-hainan-lingao/  
Data as of: 2026-10-13

Hainan Lingao. GEM records phase 1 600 MW (2024) operating.

| Field | Value |
|---|---|
| Country | China |
| Sea basin | South China Sea |
| Capacity | 600 MW |
| Turbines | 60 |
| Lifecycle stage | Operational |
| Owners | China Huaneng Group |
| Coordinates | 20.0104, 109.6229 |
| Commercial operation (announced) | 2025 |

## Milestones

- **First power** — 2024-12-27 (achieved)
- **Commercial operation** — 2025 (achieved)

## Offtake

Offtake regime of the vintage — not a recorded contract


## Sources

Every figure above traces to one of these. Quoted passages are held but not republished; follow the link for the original wording.

- Global Energy Monitor, 2026 — https://www.gem.wiki/Hainan_Lingao_Offshore_wind_farm
- Global Energy Monitor, date not stated — https://www.gem.wiki/Global_Wind_Power_Tracker_Methodology
- Global Energy Monitor, 2026 — https://www.gem.wiki/Hainan_CZ1_Offshore_wind_farm
- 国家能源局 (National Energy Administration), 2025-02-28 — https://www.nea.gov.cn/20250228/5b34e72436664acebb84688558d74c1e/c.html
- 海南日报 (Hainan Daily), 2025-02-21 — http://news.hndaily.cn/html/2025-02/21/content_58464_18279902.htm
- 国家发展和改革委员会 (NDRC), 2021-06-07 — https://www.ndrc.gov.cn/xxgk/zcfb/tz/202106/t20210611_1283088_ext.html

---

Hafrok · https://hafrok.com/projects/cn-hainan-lingao/ · please cite the page you took a figure from.
