---
title: "Guangdong Yangjiang Offshore Wind Farm R&D Demonstration Project"
source: https://hafrok.com/projects/cn-guangdong-yangjiang-offshore-wind-farm-r-d-demonstration-project/
identifier: cn-guangdong-yangjiang-offshore-wind-farm-r-d-demonstration-project
updated: 2026-10-13
---

# Guangdong Yangjiang Offshore Wind Farm R&D Demonstration Project

Source: https://hafrok.com/projects/cn-guangdong-yangjiang-offshore-wind-farm-r-d-demonstration-project/  
Data as of: 2026-10-13

Guangdong Yangjiang Offshore Wind Farm R&D Demonstration Project. GEM records phase 1 300 MW (2021) operating.

| Field | Value |
|---|---|
| Country | China |
| Sea basin | South China Sea |
| Capacity | 300 MW |
| Lifecycle stage | Operational |
| Owners | Yangjiang Mingyang Offshore Windpower Development CO LTD |
| Coordinates | 21.2405, 111.6085 |
| Commercial operation (announced) | 2021 |

## Milestones

- **Commercial operation** — 2021 (achieved)

## Offtake

Offtake regime of the vintage — not a recorded contract


## Sources

Every figure above traces to one of these. Quoted passages are held but not republished; follow the link for the original wording.

- Global Energy Monitor, 2026 — https://www.gem.wiki/Guangdong_Yangjiang_Offshore_Wind_Farm_R&D_Demonstration_Project
- Global Energy Monitor, date not stated — https://www.gem.wiki/Global_Wind_Power_Tracker_Methodology
- 国家发展和改革委员会 (NDRC), 2019-05-21 — https://www.ndrc.gov.cn/xxgk/zcfb/tz/201905/t20190524_962453.html

---

Hafrok · https://hafrok.com/projects/cn-guangdong-yangjiang-offshore-wind-farm-r-d-demonstration-project/ · please cite the page you took a figure from.
